Bridge deck replacement on Liberty Union and Old Tile Factory Roads. Spring 2009

Removal of the exsisting bridge deck

Removal of the old bridge I beams

The existing headwalls have been modified and prepaired to receive the new concrete beams.

New concrete beams are set into place with a crane.

The concrete beams are prepaired to receive a concrete cap buy tying rebar into place on top of the beams.

Concrete is poured over the beams.