Bridge deck replacement on Liberty Union and Old Tile Factory Roads. Spring 2009
Removal of the exsisting bridge deck
Removal of the old bridge I beams
The existing headwalls have been modified and prepaired to receive the new concrete beams.
New concrete beams are set into place with a crane.
The concrete beams are prepaired to receive a concrete cap buy tying rebar into place on top of the beams.
Concrete is poured over the beams.